Customer :
RAADEJ (Somagec, Etermar & Geocean Consortium)
Role :
HORIZONTAL DIRECTIONAL DRILLING
Key date :
2010
Location :
EL JADIDA, - Morocco
Description of the Project
El Jadida outfall drilled from a jetty 400m offshore.
Work done and added value of our solution
Project Engineer: Safege
Length: 1,000m
Diameter 900mm HDPE pulled Inside a 48” hole;
Drill rigs: DD650 DD 90
Jack-up barge
Subsoil: Sandstone & claystone layers
There was no water pollution, thanks to the HDD technique